Commissioning & Engineering
Preliminary survey & engineering for designing
- M.A & P&ID & Electric consumption review
- Field survey and precision measuring
- Suggestions for allowable modifications for installation and economy considerations.
- Installation
- Submits the drawing to the owner and the class for approval.
- Installation of the main and related equipment.
- Piping installation and electrical work
- Commissioning and training
- Pre-commissioning & Ship crew training
- SOx result report during Sea trial
- Start-up and SUPERVISING
- FREE-NOx ACID CLEANING SYSTEM
- Suggestions for allowable modifications for installation and economy considerations.
- Wastewater Treatment System
- INSPECTION ROBOT
- FLUSHING UNIT PRODUCTION
- Start-up and SUPERVISING
- Shipbuilding / Marine PLANT
- Land PLANT / Petrochemical PLANT Power PLANT
- New Pickling Factory
- FGSS(Fuel Gas Supply System) for Mid.-Small Ships
- FREE-NOx ACID CLEANING SYSTEM
- Cryogenic Valve Leak Test Rig
- LN2 Leak & Cold Test Skid for LNG-C, FSRU, FLNG
- Start-up and SUPERVISING
- Shipbuilding / Operating Ship
- Repair Ship
- Offshore / Onshore Plant